ŠUMARSKI LIST 7-8/1998 str. 57     <-- 57 -->        PDF

D. Pičman i T. Pentek: TKI INOLOCilJA RADA PRI STABILIZACIJI ŠUMSKIH CHSTA PRIMJENOM CEMENTOM Šumarski list br. 7-S. CXXII (1998), 353-358
FORMIRANJE
PLANUMA
jako vezana tla - highly FORMATION OF rahlija tla - loose soils
compact soils PLANUM


RAZRAHL.IIVANJE TLA USITNJAVANJE TLA
SOIL LOOSENING SOIL FRAGMENTATION
previše suh materijal
excessively dry material previše vlažan materijal
excessively mois material
VLAZENJE
VODOM
WATER IZLAGANJE SUNCU,
MOISTURIZING ZRAKU, VJETRU


EXPOSURE TO SUN, AIR, WIND


povoljna vlažnost materijala


PONOVNO


appropriate humidity material


MIJEŠANJE


REPEATED MIXING


RASIPANJE CEMENTA


CEMENT DISPERSION


MIJEŠANJE CEMENTA I ZEMLJE


MIXING OF CEMENT AND SOIL


ZBIJANJE HOMOGENE
MIJEŠAVINE TLA I CEMENTA


COMPACTING OF HOMOGENEOUS
MIXTURE OF SOIL CEMENT


NJEGOVANJE I VLAZENJE POSTELJICE U SVRHU
POBOLJŠANJA (28 DANA)


TENDING AND MOISTRURIZING THE IMPROVED
LAYER (28 DAYS)


IZRADBA NASIPA ILI KOLNIČKE KONSTRUKCIJE


CONSTRUCTION OF DAM OR DRIVEWAY


Slika I: Shema poboljšanja tla cementom po fazama rada


Figure I. Scheme of soil improvement with cement


STROJEVI ZA MEHANIZIRANU STABILIZACIJU TLA CEMENTOM
The machinery for mechanised stabilisation of the soil with cement


Prema prije nabrojanim fazama rada, pri stabilizaci- 1. dozeri, grejderi, a u posebnim slučajevima i bageri,
ji šumskih cesta cementom treba rabiti sljedeće strojeve koriste se za oblikovanje planuma
za određene vrste radova: 2. riperima se razrahlj uju jako vezana tla